
Projects
BESS / VPP
After a couple of years of research and development, I am finally deploying the first 30 MW across Texas, with the next 100 MW set to start this year.

Commercial Peak Shaving
Unlike traditional DER, these sites wish to offset consumption during peak commercial rate periods, requiring specialized sizing and programming.

Database and API/UI (full-stack)
As we grow, we need new ways to stay organized. I developed a DB to help keep track of workflow, job site images, resource management, inventory control, and time tracking. I utilized AI to assist in developing the API/UI, ensuring it is user-friendly for everyone on board.

Off-Grid Power Plant
By far, my favorite projects to work on. There is something so satisfying about creating a site with no grid reliability.

Residential Solar with Battery Back-up
A common use case for these technologies. This gives the homeowner the benefits of grid-interconnected solar production with the added security of energy storage for back-up when the grid fails.

Just for fun and learning
Sometimes for a grade, other times as a hobby. I spend most of my free time working on small projects to stay creative and sometimes as a way to simplify everyday tasks. For example, pictured below is a method I used to accurately measure an uneven surface for a project at work, which I was also able to submit for a grade in a programming class.

